The third plant in the country — and the first to pass state certification
Challenge
Install, tune and commission the entire plant: from intake of 600 tonnes of whey per day to packing of the finished product with 50–55% fat content.
Root cause
Two similar plants had been built in the country before. Neither passed state certification — on product quality, fat composition or design capacity.
What was done
Led installation, tuning and commissioning of all plant lines.
- Whey intake, clarification, pasteurisation and stabilisation
- Nanofiltration with concentration to 20% dry solids and a reverse osmosis system
- Vacuum evaporator concentrating to 60% dry solids
- Crystallisation section
- Fat section with inert-gas storage, emulsifying, homogenisation
- Two-stage drying: ICF & Welko nozzle spray tower and vibrating fluid bed dryer
- Packing into big bags and an automatic 20 kg bag line with palletising
- Two CIP cleaning circuits, SCADA and automation
Result
The plant passed state certification — unlike the two before it.
- Required product quality and fat composition
- Design capacity
- Management receives cost-per-unit data every hour