Services/Design, selection, specifications and tenders

Choosing a spray dryer? Bring in an expert before you buy, not after.

Equipment and process expertise at the design stage. Selecting the best dryer among different manufacturers, specification and tender.

Equipment delivery
01

Why it matters now

Most clients call me when everything is built and they’ve “hit a wall”. At that point fixing design errors costs many times more — modifications, downtime, lost time.

At the design stage the same decisions cost only the expert’s time.

02

What I do

  • Assess the process and equipment for your product
  • Select the dryer configuration
  • Compare offers from different manufacturers
  • Prepare the purchase specification
  • Run the tender and help choose the supplier
  • Align the specification with the manufacturer’s technical specification, layout drawings, and feed and product parameters
  • Help build a performance guarantee for your product into the supply contract — the clause most often missed
03

Why you can trust me with procurement

I have been on both sides of such tenders: for the client and for the supplier — in a €35m project. So I know where in the specification and contract the supplier keeps room for itself and the client loses protection.

04

Second opinion on a quotation

Already received a quote from a supplier? Send it — I’ll assess whether the solution and price are justified and whether there is an alternative.

05

Project

Plant construction site Process equipment installation Lifting a drying chamber section Drying towers and steel structure

Plant construction site

Case 03Oil refining, catalysts · CIS · 2020–2022 · Supplier’s representative

A €35m catalyst drying plant — from tender to completion

Challenge

Supply process equipment for a catalyst drying plant for the oil industry and take the project from tender to completion.

    Root cause

    Catalysts have strict physical and chemical requirements. Any mismatch between the client’s specification and the manufacturer’s technical specification means the equipment won’t deliver the required product.

      What was done

      Represented the equipment supplier and ran the project from tender to completion.

      • Took part in the tender
      • Aligned the client’s specification with the manufacturer’s technical specification
      • Agreed layout drawings and process line drawings
      • Agreed feed and finished product parameters with all physical and chemical properties
      • Managed the contract through to completion

      Result

      A €35m project delivered.

        Project manager3 years
        06

        What you get

        A dryer that suits your product. A contract in which the supplier is accountable for the result. Protection from mistakes that later cost months of downtime.

        Free express analysis

        A free express analysis of your dryer

        • The likely cause of the problem
        • What to check first
        • Whether a site visit is needed — or remote recommendations are enough

        Send photos and video — I’ll reply in writing within 3 working days.

        No calls, no obligations. NDA on request. Write in English or Russian.