Services/Integrated lines and turnkey plants

Commissioning · Turnkey plants and lines

Need to commission not one unit, but the whole plant?

Installation, tuning and commissioning of complete process lines and plants — from raw material intake to the pallet in the finished goods warehouse.

Building frame
01

What I do

  • Lead a team of mechanics
  • Coordinate work with the client and other contractors
  • Plan the work, deliveries of components and consumables
  • Control the quality of mechanical and electrical installation
  • Connect equipment to utilities, CIP cleaning and the automation system
  • Commission equipment one by one, then by line, then the whole plant
02

Scale

From intake of 600 tonnes of raw material per day to the packing machine and warehouse. Membrane filtration, evaporation, crystallisation, emulsifying, homogenisation, two-stage drying, packing, CIP cleaning, SCADA.

03

Projects

Case 01Dairy, whey-fat concentrate · Eastern Europe · 2019–2020 · Installation and commissioning lead

The third plant in the country — and the first to pass state certification

Challenge

Install, tune and commission the entire plant: from intake of 600 tonnes of whey per day to packing of the finished product with 50–55% fat content.

    Root cause

    Two similar plants had been built in the country before. Neither passed state certification — on product quality, fat composition or design capacity.

      What was done

      Led installation, tuning and commissioning of all plant lines.

      • Whey intake, clarification, pasteurisation and stabilisation
      • Nanofiltration with concentration to 20% dry solids and a reverse osmosis system
      • Vacuum evaporator concentrating to 60% dry solids
      • Crystallisation section
      • Fat section with inert-gas storage, emulsifying, homogenisation
      • Two-stage drying: ICF & Welko nozzle spray tower and vibrating fluid bed dryer
      • Packing into big bags and an automatic 20 kg bag line with palletising
      • Two CIP cleaning circuits, SCADA and automation

      Result

      The plant passed state certification — unlike the two before it.

      • Required product quality and fat composition
      • Design capacity
      • Management receives cost-per-unit data every hour
      Project manager · Supervisor2 years
      Case 06Building materials, ceramic tiles · Eastern Europe · 2004–2005 · Installation and commissioning lead

      A turnkey ceramic tile plant — with output exported to the EU

      Challenge

      Install, tune and commission the entire plant: from mineral raw material silos to packed tiles in the warehouse.

        What was done

        Led installation, tuning and commissioning of all plant lines.

        • Dosing, crushing and milling of mineral raw materials
        • ICF & Welko spray dryer for ceramic press powder with a colour-sequence drying programme
        • High-pressure tile pressing
        • Tunnel drying and tunnel firing kilns
        • Glazing, second firing, automatic packing and palletising

        Result

        The plant became one of the leading producers of quality tiles.

        • Output was exported to the European Union
        Project manager · Supervisor2 years
        Equipment delivery Chamber pre-assembly Foundation Drying chamber installation Equipment installation Building frame Cladding Finished production hall

        Equipment delivery

        Case 02Meat processing, animal protein powders · Eastern Europe · 2022 · General contractor

        A 4,500 m³ plant delivered turnkey — on second-hand equipment and a quarter of the original budget

        Challenge

        Build and commission a complete drying plant: spray dryer, powder storage silo, CIP station and cleaning system, and filling and packaging machine.

          Root cause

          The company dropped its bank investment loan and financed construction from working capital. With the budget cut fourfold, all equipment was bought second-hand — condition unknown and without engineering documentation for the new site.

            What was done

            Ran the project from procurement to start-up: work planning, installation supervision and commissioning.

            • As project manager, organised procurement of components, approved the plant layout and set up on-site fabrication of steel structures and assemblies
            • As supervisor, oversaw the mechanical and electrical installation of the process equipment and the building
            • As consultant, ran pre-commissioning diagnostics and resolved technical and process issues
            • Adjusted evaporation, atomisation and cleaning parameters and trained the operators

            Result

            The plant reached 100% of design capacity.

            • Full scope delivered: building construction, process line installation and commissioning
            • Product quality is consistent and in strong demand
            • The plant was built and commissioned without any bank financing
            Project manager · Supervisor · Consultant18 months

            Confirmed by a written reference from the plant owner

            Free express analysis

            A free express analysis of your dryer

            • The likely cause of the problem
            • What to check first
            • Whether a site visit is needed — or remote recommendations are enough

            Send photos and video — I’ll reply in writing within 3 working days.

            No calls, no obligations. NDA on request. Write in English or Russian.