Services/Crisis management and people

Production is running at a loss — and nobody can say why

Production crisis management: causes of losses, working with people, a way-out plan.

Industrial site with pipe racks
01

Half of success is people

The problem is rarely only in hardware and automation. Half of the result is the people who run the equipment and how they are motivated. I work with operators, technologists and management — not only with the plant.

02

What I do

  • Find the real sources of losses — including hidden ones
  • Build processes and instructions for staff
  • Prepare protocols for abnormal situations
  • Train and motivate the team
  • If needed — raise the question of whether the product meets market requirements
03

Project

Equipment delivery Chamber pre-assembly Foundation Drying chamber installation Equipment installation Building frame Cladding Finished production hall

Equipment delivery

Case 02Meat processing, animal protein powders · Eastern Europe · 2022 · General contractor

A 4,500 m³ plant delivered turnkey — on second-hand equipment and a quarter of the original budget

Challenge

Build and commission a complete drying plant: spray dryer, powder storage silo, CIP station and cleaning system, and filling and packaging machine.

    Root cause

    The company dropped its bank investment loan and financed construction from working capital. With the budget cut fourfold, all equipment was bought second-hand — condition unknown and without engineering documentation for the new site.

      What was done

      Ran the project from procurement to start-up: work planning, installation supervision and commissioning.

      • As project manager, organised procurement of components, approved the plant layout and set up on-site fabrication of steel structures and assemblies
      • As supervisor, oversaw the mechanical and electrical installation of the process equipment and the building
      • As consultant, ran pre-commissioning diagnostics and resolved technical and process issues
      • Adjusted evaporation, atomisation and cleaning parameters and trained the operators

      Result

      The plant reached 100% of design capacity.

      • Full scope delivered: building construction, process line installation and commissioning
      • Product quality is consistent and in strong demand
      • The plant was built and commissioned without any bank financing
      Project manager · Supervisor · Consultant18 months

      Confirmed by a written reference from the plant owner

      Free express analysis

      A free express analysis of your dryer

      • The likely cause of the problem
      • What to check first
      • Whether a site visit is needed — or remote recommendations are enough

      Send photos and video — I’ll reply in writing within 3 working days.

      No calls, no obligations. NDA on request. Write in English or Russian.